Thursday 11 March 2010

Essential to do before JTS

Got, need to fit:

New Rear Discs
New rear pads
New oil pressure gauge
New oil temperature gauge
New water temperature gauge
+30mm widetrack hubcentric spacers for the front wheels
Battery in boot with the parts I have
Battery cut-off switch
Rollcage padding
Front wide arches
Oil catch can needs mounting properly

To get fixed:
Dodgy brakes (possibly just re-bleeding with pressure kit?!)

To buy:
Sheets for centre console
L brackets for holding the sheets in the centre console together
New hosing for intercooler piping
New hosing for induction kit pipe run
Mikalor clamps to fit hosing (think i'll order these AFTER fitting the hoses this time!)

Then:
Fabricate centre console

Need to get the front wide arches sprayed up by my friend too.

Not essential before JTS
Fit Rear wide arches
Fit Roof vent (fully functional not a max flower stick on looking pretty job lol)
Get bucket seats
Get harnesses (4 point minimum, maybe 5/6 point?!)
Change door hinges
Wire up new centre console switches etc
Full respray in the Nissan Super White colour its currently in (Turini wide arch in white)

Finish running engine in!!

Get z32 maf
Get bigger injectors (700/800cc)
Get Greddy emanage ultimate + harness
Get car remapped for new engine/cam/turbo setup

No comments:

Post a Comment

Note: only a member of this blog may post a comment.